• NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable) Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines… Read more

  • NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time within 4:00 PM- 8:00 PM Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP) This rotational brownout due to manual… Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang National Grid Corporation of the Philippines (NGCP) subong nga adlaw, MAYO 13, 2026 (MIYERKULES), 4:00 PM- 8:00 PM (4 ka oras ang kalawigon) para sa patigayunon nga MANUAL LOAD DROPPING sang National Grid Corporation of the Philippines (NGCP) bangud sang RED ALERT STATUS sang Visayas… Read more

  • ITB 2302, S. 2023

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more