• UNSCHEDULED POWER INTERRUPTION (AUGUST 17, 2023)

    Date: August 17, 2023 (Thursday) Time of interruption: 5:21 AM Time of restoration: 5:50 AM Affected areas: Bulak Sur, Batad Action Taken: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 16, 2023)

    Date: August 16, 2023 (Wednesday) Time of interruption: 7:12 PM Time of restoration: 9:26 PM Affected areas: Zaragosa, Cabalic, Quiasan Lopez, Salvacion, Batuan, Bacolod and Dolores, Balasan Action Taken: Inspection of line and replaced damaged insulator due to animal contact on our distribution line. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 16, 2023)

    Date: August 16, 2023 (Wednesday) Time of interruption: 8:00 PM Time of restoration: 8:55 PM Affected areas: Puerto Princesa and San Fernando, Barotac Viejo Action Taken: Inspection of line and replaced busted fuse link due to severe heavy rain and lightning surge We apologize for the inconvenience. For your information. Read more

  • ENERGY CONSERVATION TIPS

    Ka-MCO! Looking for ways to save energy and money at home? Take a look at these Energy Conservation Tips we have put together, they could help you in reducing your monthly bills. Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN BAROTAC VIEJO, ILOILO

    ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 33 attendees from barangays of Bugnay and California held in Brgy. California, Barotac Viejo, Iloilo on October 16, 2024 (Wednesday). The said meeting was attended by Dir. Harry G. Tupas. This activity is made possible with the support of ILECO III BODs and Management Committee headed Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN PASIG, SARA, ILOILO

    ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 54 attendees in Brgy. Pasig, Sara, Iloilo on October 16, 2024 (Wednesday). The said meeting was attended by Punong Barangay Hon. Gina Dela Cruz. This activity is made possible with the support of ILECO III BODs and Management Committee headed by our General Manager, Atty. James Read more

  • ANO ANG RA 11552?

    An Act Extending and Enhancing the Implementation of the Lifeline Rate, Amending for the Purpose, Section 73 of Republic Act No. 9136, Otherwise known as the ‘Electric Power Industry Reform Act of 2001’ as Amended by Republic Act No. 10150 1. Ano ang Lifeline Rate kag ano ang benepisyo sa mga kwalipikado nga mga kunsomidor? Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more