• POWER RESTORATION UPDATE

    As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 11:30 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 10:12 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more

  • ILECO III ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. *A friendly reminder from ILECO III. Read more

  • IEC IN BRGY. ROJAS, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) Program to 85 MCOs in Brgy. Rojas, Ajuy, Iloilo on May 20, 2022 (Friday). *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • RE-SAGGING OF SECONDARY LINE IN ALAPASCO, BATAD

    ILECO III Technical Team conducts re-sagging of secondary line in Brgy. Alapasco, Batad, Iloilo on May 20, 2022 (Friday). For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Pagsiguro sang maayo nga insulation sang mga connection sang kuryente sa balay. *A friendly reminder from ILECO III. Read more

  • ITB 2404, S. 2024

    Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more

  • ITB 2403, S. 2024

    Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more

  • ITB 2402, S. 2024

    Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more