
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
NEWS AND UPDATES
ILECO III personnel conducted Information Education Campaign (IEC) Program to 85 MCOs in Brgy. Rojas, Ajuy, Iloilo on May 20, 2022 (Friday). *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more
ILECO III Technical Team conducts re-sagging of secondary line in Brgy. Alapasco, Batad, Iloilo on May 20, 2022 (Friday). For your information. Read more
Pagsiguro sang maayo nga insulation sang mga connection sang kuryente sa balay. *A friendly reminder from ILECO III. Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more