• SCHEDULED POWER INTERRUPTION SA MAYO 20, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa MAYO 20, 2023 (SABADO), 7:00 AM- 6:00 PM (11 ka oras ang kalawigon) para sa patigayunon nga conversion sang Single Phase Line to Three Phase Line sa Brgy. Poscolon, San Rafael. Ang lugar nga apektado sang sini nga power interruption sa Banwa… Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 16, 2023)

    Date: May 16, 2023 Time of interruption: 10:30 AM Time of restoration: 11:10 AM Affected area: Poblacion Market, Sara, Iloilo (portion) Activity: Installed 50 kVA distribution transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 11, 2023)

    Date: May 11, 2023 Time of interruption: 12:15 PM Time of restoration: 1:45 PM Affected area: Culasi, Ajuy, Iloilo (portion) Activity: Replacement of rotten pole We apologize for the inconvenience. For your information. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ONGOING BASIC LINEMEN TRAINING COURSE HELD AT ILECO III (WEEK 3)

    The start of the actual preparations and exercises on the Basic Linemen Training Course (Week 3) were the following: 1. Pole hauling2. Hole digging3. Grounding4. Pole erection5. Guying6. Anchoring7. Pole climbing exercises8. Pole dressing9. Stringing10. Tensioning, Armouring, Tying Activities mentioned above were just the first part of the rigorous trainings of the trainees to equip… Read more

  • PLEASE INPUT THE EXACT BILL AMOUNT WHEN USING GCASH, PAYMAYA AND OTHER DIGITAL PLATFORM FOR BILLS PAYMENT

    To all Member-Consumer-Owners who pay with GCash, PayMaya and other digital platform for bills payment, please input the exact bill amount indicated in your billing statement on or before the due date. A friendly reminder from your ILECO IIIĀ  Read more

  • ONGOING BASIC LINEMEN TRAINING COURSE HELD AT ILECO III

    The start of the actual preparations and exercises on the Basic Linemen Training Course (Week 2) were the following: 1. Pole hauling2. Hole digging3. Grounding4. Pole erection5. Guying6. Anchoring7. Pole climbing exercises8. Pole dressing9. Stringing10. Tensioning, Armouring, Tying Supervising these activities are the trainers from SURSECO-1 along with the observer Engineers who are from the… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more