Date: August 25, 2024 (Sunday) Time of interruption: Feeder 1 – 4:40 PM Feeders 2, 3 and 4 – 6:07 PM Time of restoration: 6:49 PM Affected area/s: All coverage of Sara Substation Cause of Interruption: Replacement of burnt by-pass connection We do apologize for the inconvenience that it caused. Thank you for your understanding. Read more
Date: August 25, 2024 (Sunday) Time of interruption: Feeder 1 – 4:40 PM Feeders 2, 3 and 4 – 6:07 PM Time of restoration: Not Yet Determined Affected area/s: All coverage of Sara Substation Cause of Interruption: Replacement of burnt by-pass connection For your information. Read more
Date: August 25, 2024 (Sunday) Time of interruption: 4:40 PM Time of restoration: F2, F3 and F4 – 4:51 PM Feeder 1 – Not Yet Determined Affected area: Portion of Sara All Barangays of San Dionisio Cause of Interruption: Animal Contact at Sara Substation which resulted in a burnt by-pass connection. For your information. Read more
NEWS AND UPDATES
REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting. Clean the condenser tube regularly. Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened. Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.… Read more
From ILECO III Family! Read more
1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more
The start of the actual preparations and exercises on the Basic Linemen Training Course (Week 3) were the following: 1. Pole hauling2. Hole digging3. Grounding4. Pole erection5. Guying6. Anchoring7. Pole climbing exercises8. Pole dressing9. Stringing10. Tensioning, Armouring, Tying Activities mentioned above were just the first part of the rigorous trainings of the trainees to equip… Read more
BIDS AND NOTICES
15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more
Procurement of Boom Truck Read more