• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 4:15 AM Time of Restoration: 7:00 AM Affected Area: Binuluangan and Tabugon Island, Carles Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 6, 2022)

    Date: September 6, 2022 Time of interruption: 5:45 PM Time of Restoration: 6:00 PM Affected Area: Sitio Carrida, San Lucas, Barotac Viejo Activity: Repair secondary load due to loose connection of side DX Transformer Supply 37.5 kVa and private transformer load side connection. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 6, 2022)

    Date: September 6, 2022 Time of interruption: 5:25 PM Time of Restoration: 5:53 PM Affected Area: Cabalic and Batuan, Balasan Activity: Inspection of lines and replaced busted fuselink. We apologize for the inconvenience. For your information. Read more

  • ANTI-PILFERAGE ACT (RA 7832)

    Read more

  • ILECO III ENERGY SAVING TIP

    Mag-gamit sang electric fan sa baylo sang air conditioning system. *A friendly reminder from ILECO III. Read more

  • NGAA MAY POWER INTERRUPTION?

    Ang power interruption amo ang temporaryo nga pag-untat sang supply sang kuryente sa isa ka lugar ukon balay. May duha ka sahi sang power interruption: 1. NATALANA (SCHEDULED) 2. WALA NATALANA (UNSCHEDULED) Mga rason nga-a may ara sang scheduled power interruption:• Pagkay-o sang makinaryas• Pagkay-o kag pagmentinar sang linya sang kuryente• Line Clearing Activities• Pag-relocate… Read more

  • ILECO III ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. *A friendly reminder from ILECO III. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more