
POWER RATES
POWER ADVISORIES
All ILECO III Feeders were energized. The reason of power interruption was the over voltage of transmission line of NGCP caused by tripping of power generation plant on April 27, 2023 at around 1:53 PM affecting the entire Panay Island. We apologize for the inconvenience. For your information. Read more
ILECO III Technical Team is still coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more
Date: April 27, 2023 Time of interruption: 9:47 PM Affected areas: Feeder 1-Sara Substation TIME OF POWER RESTORATION: NOT YET DETERMINED For your information. Read more
NEWS AND UPDATES
ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in San Dionisio, San Rafael, Iloilo with 37 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more
ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Badiang, Anilao, Iloilo with 84 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more
ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bagacay, San Dionisio, Iloilo with 64 attendees on July 20, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more