• POWER ADVISORY UPDATE as of 12:00 p.m., April 30, 2023

    Sa subong nga ti-on ang TANAN nga feeders sang mga masunod nga substations ang aton na nga na-energized: Sara Substation Ajuy Substation Banate Substation Balasan Substation Daan Banwa Substation Barotac Viejo Substation Ang aton nga mga feeders ang 100% energized na sa kabilugan nga coverage sang ILECO III. Sa liwat, ang mga nag-kalatabo nga shutdown… Read more

  • POWER ADVISORY UPDATE as of 10:00 p.m., April 29, 2023

    Sa subong nga ti-on ang mga energized nga mga feeders amo ang mga masunod: Sara Substation- Feeders 1 to 3 remain online except for Feeder 4 due to rotational brownout and was shutdown @ 4:40 PM Ajuy Substation – Feeder 1 was shutdown (Portion sang Ajuy kag Concepcion) 4:39 PM due to rotational brownout and… Read more

  • SCHEDULE OF ROTATIONAL BROWNOUTS

    Pahibalo sa aton mga katapo-konsumidor sang ILECO III nahanungod sa gina implementar nga Rotational Brownouts sang NGCP. Dugang diri, wala pa mahibalu-an kung ano oras maga-balik ang supply sang kuryente sa mga apektado nga Feeders. Madamo gid nga salamat sa padayon nga paghangup. Read more

  • HOME OWNERS ASSOCIATION AND BAPA OFFICERS JOINT MEETING IN NHA VILLAGE DAYHAGAN, CARLES

    ILECO III personnel conducted Home Owners Association and BAPA Officers Joint Meeting in NHA Village, Dayhagan, Carles, Iloilo with 11 attendees today, July 29, 2022 (Friday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more

  • ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN NHA VILLAGE, BACJAWAN SUR, CONCEPCION

    Instead of going to the Main Office at Preciosa, Sara, Iloilo, ILECO III conducted an on-site Pre-Membership Seminar to 116 applicants at NHA Village, Bacjawan Sur, Concepcion, Iloilo. This is the first step in applying an electric service connection. The regular pre-membership seminar is held at the Main Office every Tuesday & Thursday. Registration starts… Read more

  • IEC AND BAPA ASSEMBLY IN SITIO NABALAS, CULASI, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in Sitio Nabalas, Culasi, Ajuy, Iloilo with 100 attendees on July 27, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • ITB 2404, S. 2024

    Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more

  • ITB 2403, S. 2024

    Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more

  • ITB 2402, S. 2024

    Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more