    Ginapahibalo ang tanan nga mga katapo-konsumidores sang ILECO III nga maga-implementar sang ROTATING POWER INTERRUPTION o Manual Load Dropping (MLD), subong nga adlaw alas 7:00 sa aga Enero 3, 2024 ang aton Kooperatiba bangud indi sa gihapon supisyente ang power supply sang mga Power Generation sa Panay Island kag National Grid Corporation of the Philippines… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION – UPDATE as of January 3, 2024 6:05 AM

    Date: January 02, 2024 (Tuesday) Natividad S/sTime of Interruption: 5:55 PMTime Restored: Feeder 1: 6:55PMFeeder 2: 6:55PMFeeder 3: 2:30 AM Sara S/sTime of Interruption: 5:57 PMTime Restored: Feeder 1 – Not Yet DeterminedFeeder 2 – 9:30 PMFeeder 3 – 9:30 PMFeeder 4 – 9:34 PM Banate S/s Time of Interruption : 5:55 PMTime Restored: Feeder… Read more

  • ILECO III POWER ADVISORY: NGCP UNSCHEDULED POWER INTERRUPTION – UPDATE as of 10:39 PM

    Date: January 02, 2024 (Tuesday) Natividad S/sTime of Interruption: 5:55 PMTime Restored: Feeder 1: 6:55PMFeeder 2: 6:55PMFeeder 3: Not yet Determined Sara S/sTime of Interruption: 5:57 PMTime Restored: Feeder 1 – Not Yet DeterminedFeeder 2 – 9:30 PMFeeder 3 – 9:30 PMFeeder 4 – 9:34 PM Banate S/s Time of Interruption : 5:55 PMEstimated Time… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more

  • ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR IN NHA VILLAGE, BACJAWAN SUR, CONCEPCION

    Instead of going to the Main Office at Preciosa, Sara, Iloilo, ILECO III conducted an on-site Pre-Membership Seminar to 116 applicants at NHA Village, Bacjawan Sur, Concepcion, Iloilo. This is the first step in applying an electric service connection. The regular pre-membership seminar is held at the Main Office every Tuesday & Thursday. Registration starts… Read more

  • IEC AND BAPA ASSEMBLY IN SITIO NABALAS, CULASI, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in Sitio Nabalas, Culasi, Ajuy, Iloilo with 100 attendees on July 27, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, BACJAWAN NORTE, CONCEPCION

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bacjawan Norte, Concepcion, Iloilo with 104 attendees on July 26, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more