• MAY SCHEDULED PREVENTIVE MAINTENANCE KAG LOAD TRANSFER ANG NGCP SA HULYO 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE kag LOAD TRANSFER ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa HULYO 15, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 6:00 PM (13 ka oras… Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION

    DATE: July 06, 2023 (Thursday) Time of interruption:Ajuy S/s: 9:00PMSara S/s: 9:00 PMPani-an S/s: 9:01 PMDaan Banwa S/s: 9:00 PM Estimated Time of power restoration: Sara S/s: 9:10 PMAjuy S/s: 9:08 PMPani-an S/s: 9:13 PMDaan Banwa S/s: 9:15 PM Affected areas: Whole coverage of ILECO III Cause of interruption: UNDER INVESTIGATION Our technical team is… Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION (UPDATE)

    DATE: July 05, 2023 (Wednesday) Time of interruption:Barotac Viejo S/s: 8:50 PMBanate S/s: 8:50 PM Estimated Time of power restoration: Barotac Viejo S/s : 9:05 PMBanate S/s: 9:06 PM Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: UNDER INVESTIGATION Our technical team is closely coordinating with NGCP regarding the cause of… Read more

  • ILECO III, isa na ka Accredited Competency Assessment Center for ELECTRIC POWER DISTRIBUTION LINE CONSTRUCTION (EPDLC) NC II

    SA TANAN NGA MGA MIYEMBRO-KONSUMIDORES SANG ILECO III: Isa na naman ka daku nga kadalag-an ang nakuha sang ILECO III tungod sang pag-certify sang Technical Education and Skills Development Authority (TESDA) sang aton Kooperatiba bilang Accredited Competency Assessment Center for ELECTRIC POWER DISTRIBUTION LINE CONSTRUCTION (EPDLC) NC II sang Hunyo 29, 2022. Ang aton Kooperatiba… Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting. Clean the condenser tube regularly. Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened. Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.… Read more

  • 2022 LINEMEN APPRECIATION DAY

    ILOILO III ELECTRIC COOPERATIVE, INC. joins in celebrating the 2022 Linemen Appreciation Day, August 1, 2022 ILECO III’s Board of Directors, Management and Employees expresses heartfelt gratitude to all the men and women of 121 Electric Cooperatives and Rural Electrification who ensures quality service to all our Member-Consumer-Owners. Mabuhay po ang sundalo ng pailaw!  #ILECO3WarriorsOfLight#SundaloNgPailaw#2022LinemenAppreciationDay Read more

  • UNDERSTANDING THE POWER BILL AND RATE COMPOSITION

    Ang tanan nga rate sang isa ka Electric Cooperative (EC) gina-approve sang Energy Regulatory Commission (ERC) bag-o ini paga-sukton sa mga konsumidor. Ano bala ang ka-undan sang aton mga power bill kag diin ini nagakadto? GENERATION SYSTEM CHARGEIni ang ginasukot sang mga Electric Cooperatives para bayaran ang ginakuha nga kuryente halin sa mga power suppliers.… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more