• REPAIR AND ISOLATION OF KWHR METER CAUSED BY VEHICULAR ACCIDENT IN PANI-AN, BALASAN

    ILECO III Technical personnel repaired and isolate Five (5) kWhr meter caused by vehicular accident at Pani-an, Balasan today, October 29, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more

  • ILECO III PERSONNEL NAGPARTISIPAR SA RESCUE OPERATION SA BANWA SANG ANILAO

    ILECO III personnel nagpartisipar sa rescue operation sang mga Miyembro-Konsumidores sa Anilao kaupod ang Anilao Municipal Disaster Risk Reduction Management Office (MDRRMO) sa Brgy. Sta. Rita, Anilao bangud sa mataas nga tubig baha sa ila lugar. Ang serbisyo sang ILECO III para gid sa mga MCOs. Stay alert kag hibalu-on ang local hotlines sang inyo… Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 28, 2022)

    Date: October 28, 2022 Time of interruption: 6:13 PM Time of Restoration: 7:15 PM Affected Area: Balantian, Balasan Reason/Activity: Line fault due to heavy rain and lightning surge/ Inspection of line and replaced busted fuse link. We apologize for the inconvenience. For your information. (Photo is pixelated and distorted due to heavy rain) Read more

  • ILECO III “LOVE ON WHEELS” GOES TO BRGY. LUMBIA, ESTANCIA, ILOILO

    In line with the celebration of 13th National Electrification Awareness Month (NEAM), the roving community pantry of ILECO III “Love on Wheels” was conducted today, August 05, 2022 (Friday) in Brgy. Lumbia, Estancia, Iloilo. ILECO III prepared grocery items and snacks and extended assistance to one hundred thirty (130) BAPA members of Sitio Pinaypayan and… Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNIT Buy an aircon with high Energy Efficiency. Ratio indicated in the yellow label. Change or clean your AC’s air filters regularly. Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs. Repair leaky ducts to reduce heating and cooling costs. Decorate for a cooler… Read more

  • INDIVIDUAL PROMPT PAYORS FOR JULY 2022 BILLING

    Thank you to our beloved Member-Consumer-Owners (MCOs) for paying your bills promptly. Keep safe always. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, TIPACLA, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Tipacla, Ajuy, Iloilo with 34 attendees on August 04, 2022 (Thursday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more