• RESCHEDULED POWER INTERRUPTION

    Pahibalo sa mga katapo-konsumidores nga ang PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 03, 2023 (SABADO) ang GIN-RESCHEDULE sa HUNYO 04, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: HUNYO 04, 2023 (DOMINGO)6:00 AM- 6:00 PM (12 ka… Read more

  • KANSELADO ANG ANNUAL PREVENTIVE MAINTENANCE SANG NGCP SA HUNYO 4, 2023

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang LOAD TRANSFER kag ANNUAL PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Panit-an 138/69kV 50MVA Transformer sa HUNYO 04, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang KANSELADO nga power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka oras ang kalawigon)KAG4:00… Read more

  • ILECO III POWER ADVISORY: UNSCHEDULED POWER INTERRUPTION

    AS OF 4:30 PM, MAY 31, 2023 CAUSE: HEAVY RAIN AFFECTED SUBSTATION: SARA SUBSTATION FOR YOUR INFORMATION AND REFERENCE. Read more

  • ILECO III “LOVE ON WHEELS” GOES TO BRGY. LUMBIA, ESTANCIA, ILOILO

    In line with the celebration of 13th National Electrification Awareness Month (NEAM), the roving community pantry of ILECO III “Love on Wheels” was conducted today, August 05, 2022 (Friday) in Brgy. Lumbia, Estancia, Iloilo. ILECO III prepared grocery items and snacks and extended assistance to one hundred thirty (130) BAPA members of Sitio Pinaypayan and… Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNIT Buy an aircon with high Energy Efficiency. Ratio indicated in the yellow label. Change or clean your AC’s air filters regularly. Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs. Repair leaky ducts to reduce heating and cooling costs. Decorate for a cooler… Read more

  • INDIVIDUAL PROMPT PAYORS FOR JULY 2022 BILLING

    Thank you to our beloved Member-Consumer-Owners (MCOs) for paying your bills promptly. Keep safe always. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, TIPACLA, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Tipacla, Ajuy, Iloilo with 34 attendees on August 04, 2022 (Thursday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more