
POWER RATES
POWER ADVISORIES
What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable) Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines… Read more
What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time within 4:00 PM- 8:00 PM Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP) This rotational brownout due to manual… Read more
Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang National Grid Corporation of the Philippines (NGCP) subong nga adlaw, MAYO 13, 2026 (MIYERKULES), 4:00 PM- 8:00 PM (4 ka oras ang kalawigon) para sa patigayunon nga MANUAL LOAD DROPPING sang National Grid Corporation of the Philippines (NGCP) bangud sang RED ALERT STATUS sang Visayas… Read more
NEWS AND UPDATES
Sara Area Coverage – August 16, 2022 Natividad Area Coverage – August 16, 2022 Read more
Ari sa idalom ang pagsulondan kung paano mag proseso sang Metro nga gusto mo ipapangalan na sa imo tungod ang tag-iya sang metro nga imo ginagamit nag lakat na (abroad, naghalin sang lokasyon) ukon nagtaliwan na (deceased). Read more
Happy birthday Admin. Emmanuel P. Juaneza, Administrator of National Electrification Administration (NEA). From ILECO III Family! National Electrification Administration (NEA) National Electrification Administration Read more
Witness the ceremonial switch-on of the 15th million consumer energized by an electric cooperative. https://www.facebook.com/aselco/videos/801883787836401/ Read more
BIDS AND NOTICES
Procurement of Poles Read more
15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more