• UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 7:10 AM Time of restoration: 8:00 AM Affected areas: Salong, Batad Action Taken: Inspection of primary line, pull-out animal contact (bird) and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 10:55 AM Time of restoration: 11:28 AM Affected areas: Gomez St., Poblacion, Carles Action Taken: Inspection of secondary line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 25, 2023)

    Date: August 25, 2023 (Friday) Time of interruption: 4:04 AM Time of restoration: 9:31 AM Affected areas: C. Pedrana and S. Ganzon St., Poblacion, Balasan Action Taken: Repaired connection and repaired two (2) pieces damaged transformer bushing We apologize for the inconvenience. For your information. Read more

  • Ano ang Requirements for Change of Name?

    Ari sa idalom ang pagsulondan kung paano mag proseso sang Metro nga gusto mo ipapangalan na sa imo tungod ang tag-iya sang metro nga imo ginagamit nag lakat na (abroad, naghalin sang lokasyon) ukon nagtaliwan na (deceased). Read more

  • HAPPY BIRTHDAY ADMIN JUANEZA!

    Happy birthday Admin. Emmanuel P. Juaneza, Administrator of National Electrification Administration (NEA). From ILECO III Family! National Electrification Administration (NEA) National Electrification Administration Read more

  • LIVE! CEREMONIAL SWITCH-ON OF THE 15TH MILLION CONSUMER ENERGIZED BY AN EC

    Witness the ceremonial switch-on of the 15th million consumer energized by an electric cooperative. https://www.facebook.com/aselco/videos/801883787836401/ Read more

  • Rural electrification at its best!

    Please tune in later to the live streaming of the ceremonial switch-on of the 15th million consumer energized by an electric cooperative. We, in ILECO III, together with the other 120 electric cooperatives (ECs) in the country, will continue to pursue our mandate of countryside development through rural electrification. https://www.facebook.com/OfficialNEA/posts/pfbid02CygcMsZpNk72gLMqpHBr5vZ8Do5oUor9cGJeCkdKuzHpXUCcc19dcKJMfqX16vyql Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more