• NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable) Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines… Read more

  • NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time within 4:00 PM- 8:00 PM Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP) This rotational brownout due to manual… Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang National Grid Corporation of the Philippines (NGCP) subong nga adlaw, MAYO 13, 2026 (MIYERKULES), 4:00 PM- 8:00 PM (4 ka oras ang kalawigon) para sa patigayunon nga MANUAL LOAD DROPPING sang National Grid Corporation of the Philippines (NGCP) bangud sang RED ALERT STATUS sang Visayas… Read more

  • ILECO III LINE CLEARING ACTIVITY

    (In line with the celebration of 2022 National Electrification Awareness Month) Location: Brgy. Guinticgan, Carles Date: August 27, 2022 https://www.facebook.com/watch/?v=758945878497574 Read more

  • NEA-EC SIMULTANEOUS TREE PLANTING ACTIVITY

    ILECO III joins the NEA-EC Simultaneous Tree Planting Activity in line with 2022 celebration of National Electrification Awareness Month (NEAM)Location: So. Bakahan, Brgy. Del Castillo, Sara Date: August 26, 2022 https://www.facebook.com/watch/?v=394788452802587 Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more

  • ILECO III Trivia Fact #4

    ANTI-OBSTRUCTION OF POWER LINES ACT (RA 11361) An Act ensuring the continuous and uninterrupted transmission and distribution of electricity and protection of the integrity and reliability of power lines, and providing penalties for violations thereof. Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more

  • ITB 2206, S. 2022

    Procurement of 4X4 Pick Up Vehicle for Area Offices and Utility Van for Main Office Read more

  • ITB 2205, S. 2022

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loan, and Maintenance Use Read more