• EMERGENCY POWER INTERRUPTION (SEPTEMBER 5, 2022)

    Date: September 05, 2022 (Monday)Time of interruption: 3:30 PMEstimated time of power restoration: 5:30 PMDuration: 2 hoursActivity: Pull-out of TELCO poles in San Duionisio, Iloilo Affected areas:SAN DIONISIO:DugmanTubleSan NicolasCudionanHda ConchitaSuaTiabasCubayBagacayManduawakTalo-atoAgdaliranBorongonCanasBatuanAmayongMadanlogOdiongan We apologize for the inconvenience. For your information Read more

  • EMERGENCY POWER INTERRUPTION (SEPTEMBER 5, 2022)

    Date: September 05, 2022 (Monday)Time of interruption: 12:00NNEstimated time of power restoration: 1:00 PMDuration: 1 hourActivity: Pull-out of TELCO poles in Balasan, IloiloAffected areas:BALASAN- All BarangaysCARLES- All Barangays except island barangays We apologize for the inconvenience. For your information. Read more

  • REPLACEMENT OF ROTTEN POLE AT D.V. SALCEDO ST., POBLACION ILAWOD, SARA

    ILECO III Technical personnel conducted replacement of rotten pole at D.V Salcedo St., Poblacion Ilawod, Sara today, September 1, 2022 (Thursday). Keep safe Warriors of Light For your information. Read more

  • NATIONAL COOPERATIVES MONTH

    Iloilo III Electric Cooperative, Inc. together with all 121 Electric Cooperatives in the Philippines celebrates National Cooperatives Month 2022 with the theme “KoopPinas: Nagkakaisang Lakas Para sa Makabuluhan at Sama-samang Pag-unlad!” Read more

  • Trivia Question #9

    Ano ang apat (4) ka kabanwahanan nga nasakupan sang Pani-an Area Office (PAO)? In any order Read more

  • Trivia Question #8

    Maghatag sang lima (5) ka banwa nga nasakupan sang Sara Area Office (SAO). Read more

  • ILECO III Trivia Fact#16

    Ang apat (4) ka banwa nga yara sa area coverage sang Natividad Area Office ukon (NAO) amo ang mga masunod: AnilaoBanateBarotac ViejoSan Rafael Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more