• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 8, 2022)

    Date: September 8, 2022 Time of interruption: 6:56 AM Time of Restoration: 9:15 AM Affected Area: Tabugon Proper and Tabugon Minor, Carles (Island) Activity: Inspection of line and replaced busted fuselink and change defective kWhr Meter We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 7:05 PM Time of Restoration: 7:35 PM Affected Area: Sitio Cawayan Sulod, Cawayan, Carles Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 5:54 PM Time of Restoration: 6:46 PM Affected Area: Tupas St., Poblacion, Barotac Viejo Activity: Repair secondary inner jumper cut-off We apologize for the inconvenience. For your information. Read more

  • NATIONAL COOPERATIVES MONTH

    Iloilo III Electric Cooperative, Inc. together with all 121 Electric Cooperatives in the Philippines celebrates National Cooperatives Month 2022 with the theme “KoopPinas: Nagkakaisang Lakas Para sa Makabuluhan at Sama-samang Pag-unlad!” Read more

  • Trivia Question #9

    Ano ang apat (4) ka kabanwahanan nga nasakupan sang Pani-an Area Office (PAO)? In any order Read more

  • Trivia Question #8

    Maghatag sang lima (5) ka banwa nga nasakupan sang Sara Area Office (SAO). Read more

  • ILECO III Trivia Fact#16

    Ang apat (4) ka banwa nga yara sa area coverage sang Natividad Area Office ukon (NAO) amo ang mga masunod: AnilaoBanateBarotac ViejoSan Rafael Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more