
POWER RATES
POWER ADVISORIES
SARA SUBSTATION BANATE SUBSTATION DAAN BANWA AJUY SUBSTATION NATIVIDAD SUBSTATION was de-energized due to NGCP shutdown. ILECO III Technical Team is still closely coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. Power restoration to affected areas is not yet determined. We apologized for the… Read more
Power were restored in: ANILAOBANATEBAROTAC VIEJOSAN RAFAEL Additional power restored in: SAN DIONISIOLEMERY PORTION OF SARA While Daan Banwa Substation Feeder 1 was de-energized at around 11:19 PM due to Manual Load Dropping. Power restoration to affected areas is not yet determined. ILECO III Technical Team is still closely coordinating with National Grid Corporation of… Read more
Date: April 28, 2023 (Friday) Time of interruption: 11:19 PM Affected areas: Feeder 1-Daan Banwa Substation TIME OF POWER RESTORATION: NOT YET DETERMINED For your information. Read more
NEWS AND UPDATES
Iloilo III Electric Cooperative, Inc. together with all 121 Electric Cooperatives in the Philippines celebrates National Cooperatives Month 2022 with the theme “KoopPinas: Nagkakaisang Lakas Para sa Makabuluhan at Sama-samang Pag-unlad!” Read more
Ano ang apat (4) ka kabanwahanan nga nasakupan sang Pani-an Area Office (PAO)? In any order Read more
Maghatag sang lima (5) ka banwa nga nasakupan sang Sara Area Office (SAO). Read more
Ang apat (4) ka banwa nga yara sa area coverage sang Natividad Area Office ukon (NAO) amo ang mga masunod: AnilaoBanateBarotac ViejoSan Rafael Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more