
POWER RATES
POWER ADVISORIES
What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable) Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines… Read more
What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time within 4:00 PM- 8:00 PM Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP) This rotational brownout due to manual… Read more
Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang National Grid Corporation of the Philippines (NGCP) subong nga adlaw, MAYO 13, 2026 (MIYERKULES), 4:00 PM- 8:00 PM (4 ka oras ang kalawigon) para sa patigayunon nga MANUAL LOAD DROPPING sang National Grid Corporation of the Philippines (NGCP) bangud sang RED ALERT STATUS sang Visayas… Read more
NEWS AND UPDATES
Pagkatapos mabahaan ang inyo lugar, indi anay pag-buksan ang main switch. Magtawag sang accredited electrician para macheck ang inyo linya. Keep safe our beloved Member-Consumer-Owners! Read more
Indi pagtandugon ang mga basa nga wirings sang kuryente. Keep safe our beloved Member-Consumer-Owners! Read more
Sending prayers to all ILECO III Warriors of Light! Keep safe and may God bless you during response operations! Read more
1. Patyon ang Main Switch kung nagabaha na sa inyo lugar. 2. Indi pagtandugon ang mga basa nga wirings sang kuryente. 3. Indi magsaka sa mga kahoy bangud possible nga maglatay ang boltahe sang kuryente sa mga basa nga sanga. 4. Pagkatapos mabahaan ang inyo lugar, indi anay pagbuksan ang main switch. Magtawag sang accredited… Read more
BIDS AND NOTICES
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more