• NGCP’s UNSCHEDULED POWER INTERRUPTION (JULY 5, 2023)

    DATE: July 05, 2023 (Wednesday) Time of interruption: 4:31 AM Estimated Time of power restoration: NOT YET DETERMINED Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: UNDER INVESTIGATION Our technical team is closely coordinating with NGCP for the power restoration. We apologize for the inconvenience. For your information.  Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 3, 2023)

    Date: July 03, 2023 Time of interruption: 8:05 AM Time of restoration: 8:20 AM Affected area: Batad Municipal Building Action taken: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA HULYO 12-13, 2023 SA BANWA SANG BALASAN

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BALASAN amo ang masunod: HULYO 12, 2023 (MIYERKULES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Kinalkalan HULYO 13, 2023 (HUWEBES)8:00 AM- 5:00… Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • BAPA JOINT MEETING IN BRGY. TALOKGANGAN, BANATE

    LOOK: ILECO III personnel conducted BAPA Joint Meeting held at Tito Paps, Brgy. Talokgangan, Banate with 131 Attendees from different BAPA Association from Natividad Area Coverage last January 11, 2023 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more