• SCHEDULED POWER INTERRUPTION SA SETYEMBRE 19, 29 KAG 30, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-ilis sang poste, pag-convert kag pag-construct sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGARSETYEMBRE 19, 2022 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) •… Read more

  • SCHEDULED POWER INTERRUPTIONS SA SETYEMBRE 17, 19 KAG 20, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga pag-clearing sang mga linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: SETYEMBRE 17, 2022 (SABADO)8:00 AM- 4:00 PM(8 ka oras ang kalawigon)• Sitio Lo-ong Bukid, Lo-ong, Concepcion SETYEMBRE 19, 2022 (LUNES)8:00… Read more

  • SCHEDULED POWER INTERRUPTION SA SETYEMBRE 17, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-replace sang mga rotten poles sa Brgy. Capiñahan, Lemery. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: SETYEMBRE 17, 2022 (SABADO)8:00 AM- 5:00 PM(9 ka oras ang kalawigon) • Capiñahan, Lemery Madamo gid nga… Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • BAPA JOINT MEETING IN BRGY. TALOKGANGAN, BANATE

    LOOK: ILECO III personnel conducted BAPA Joint Meeting held at Tito Paps, Brgy. Talokgangan, Banate with 131 Attendees from different BAPA Association from Natividad Area Coverage last January 11, 2023 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more