• UNSCHEDULED POWER INTERRUPTION (JUNE 20, 2023)

    Date: June 20, 2023 Time of interruption: 1:10 PM Time of restoration: 3:20 PM Affected area: Sitio Darangkalan and Sitio Vencer, Sto. Tomas, Barotac Viejo, Iloilo Cause: Line fault due to vegetation (bamboo) We apologize for the inconvenience. For your information. Read more

  • SCHEDULED CORRECTIVE MAINTENANCE SANG NGCP SA HUNYO 25, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may SCHEDULED CORRECTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 25, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: HUNYO 25, 2023 (DOMINGO)6:00 AM- 6:00 PM (12 ka oras ang kalawigon)•… Read more

  • SCHEDULED POWER INTERRUPTION SA HUNYO 23, 2023 SA BANWA SANG SARA

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 23, 2023 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang lugar nga apektado sang sini nga power interruption sa banwa sang SARA amo ang masunod:• Antonio Yusay• Bato• Aguirre• Juaneza• Aposaga• Malapaya• Ardemil•… Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • BAPA JOINT MEETING IN BRGY. TALOKGANGAN, BANATE

    LOOK: ILECO III personnel conducted BAPA Joint Meeting held at Tito Paps, Brgy. Talokgangan, Banate with 131 Attendees from different BAPA Association from Natividad Area Coverage last January 11, 2023 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more