
POWER RATES
POWER ADVISORIES
Date: May 29, 2024 (Wednesday) Time of interruption: 9:00 AM Time of restoration: 10:30 AM Affected area: Villa Pani-an, Estancia, Iloilo Activities: Replaced damage transformer and conducted load splitting For your information. Read more
Date: May 29, 2024 Time of interruption: 9:21 AM Estimated time of restoration: 2:00 PM Activity: On-going replacement of two (2) rotten poles and rehabilitation of khwr meters Affected area: Brgy. Moto, San Dionisio, Iloilo For your information. Read more
Pahibalo sa mga katapo-konsumidores nga ang SCHEDULED POWER INTERRUPTION sang ILECO III sa MAYO 29, 2024 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) ang GIN-RESCHEDULE sa HUNYO 04, 2024 (MARTES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing activities. Ang lugar nga apektado sang sini nga… Read more
NEWS AND UPDATES
PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more
Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more
Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more
GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more
BIDS AND NOTICES
Procurement of Distribution Transformer Loss Tester Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more