• UNSCHEDULED POWER INTERRUPTION (MAY 2, 2023)

    Date: May 02, 2023 Time of interruption: 12:56 PM Time of restoration: 2:37 PM Affected area: Sitio Tuong, Pantalan, Carles, Iloilo Activity: Repaired secondary neutral jumper cut-off We apologize for the inconvenience. For your information. Read more

  • POWER ADVISORY

    NAHANUNGOD SA NAGA LAPTA NGA MESSAGE SA ATON NGA FB MESSENGER  Read more

  • POWER ADVISORY UPDATE as of 12:00 p.m., April 30, 2023

    Sa subong nga ti-on ang TANAN nga feeders sang mga masunod nga substations ang aton na nga na-energized: Sara Substation Ajuy Substation Banate Substation Balasan Substation Daan Banwa Substation Barotac Viejo Substation Ang aton nga mga feeders ang 100% energized na sa kabilugan nga coverage sang ILECO III. Sa liwat, ang mga nag-kalatabo nga shutdown… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ENERGY SAVING TIP

    Turn off the lights when not needed. Read more

  • LOVE MONTH NA!

    Do you know someone who deserves some love? Visit the post below on ILECO III Official Facebook Page and follow the instructions: https://www.facebook.com/ILECO3/posts/pfbid02uPeWT17NzDGZHobRFMpKatSpiyn3U7e2PeW8iDgJKcgKR6ePaaToXUCL6AaWwqhWl Step 1. Share with us below the picture of your loved one/s.Step 2. Tag/mention him/her and tell us one special thing about him/her.Step 3. Use the #ILECO3ISLOVE in your caption for your entry to… Read more

  • ENERGY SAVING TIP

    Use smart automated devices. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more