• UNSCHEDULED NGCP POWER INTERRUPTION (FEBRUARY 20, 2023)

    Time of interruption: 6:28 p.m.Estimated time of restoration: Not yet determined Affected Areas: Municipalities of ANILAO, BANATE, BAROTAC VIEJO and SAN RAFAEL Cause of interruption: Load shedding of the transmission provider, National Grid Corporation of the Philippines (NGCP) Our Technical Team is closely coordinating with NGCP for the updates and estimated time of power restoration.… Read more

  • UNSCHEDULED NGCP POWER INTERRUPTION (FEBRUARY 20, 2023)

    Time of interruption: 1:28 p.m.Estimated time of restoration: Not yet determined Affected Areas (ILECO III): Municipalities of ANILAO, BANATE, BAROTAC VIEJO, SAN RAFAEL, SARA, SAN DIONISIO, CONCEPCION, AJUY, LEMERY, BATAD, ESTANCIA, BALASAN, and CARLES Cause of interruption: High system voltage of Panay Grid transmission line operated by the National Grid Corporation of the Philippines (NGCP)… Read more

  • UNSCHEDULED POWER INTERRUPTION UPDATEAs of 12:45 PM, February 20, 2023 (Monday)

    For your information. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa publiko nga sugod sa Pebrero 01, 2023 (Miyerkules) pagakwa-on na sang ILECO III ang tanan nga mga unauthorized cable wires sang mga unlicensed Telco/Internet Providers nga naga-attach sa poste sang ILECO III nga wala sang pahanugot halin sa aton kooperatiba bangud isa ini ka rason sang unscheduled power interruptions nga nagaluntad sa aton… Read more

  • ILECO III DONATED ELECTRIC FANS TO ELEMENTARY SCHOOLS OF SAN DIONISIO, ILOILO

    Through the efforts of Dir. Vincent H. Belita (Board of Director- District III, San Dionisio and Concepcion), ILECO III turned-over twenty four (24) stand fans to all elementary schools in San Dionisio, Iloilo on February 1, 2023 (Wednesday). Engr. Belita also give his message informing the educators of the present power industry set-up. He also… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ENERGY SAVING TIP

    Turn off the lights when not needed. Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more