
POWER RATES
POWER ADVISORIES
Time of interruption: 6:28 PM Time of Restoration: NOT YET DETERMINED Affected areas: SAN DIONISIO – All barangaysSARA (portion)CONCEPCION- Aglosong We are currently conducting line inspection prior of power restoration for the safety of our Member-Consumer-Owners (MCOs). We apologize for the inconvenience. Read more
Date: November 16, 2022 Time of interruption: 4:10 PM Time of Restoration: 6:35 PM Cause of interruption: Line fault due to lightning surge, gusty wind and heavy rain and vegetation Affected areas: Brgy. Drancalan, Batad We apologize for the inconvenience. For your information. Read more
Date: November 16, 2022 Time of interruption: 4:10 PM Time of Restoration: 5:25 PM Cause of interruption: Line fault due to lightning surge, gusty wind and heavy rain. Affected areas: Sitio Lampirong, Poblacion, Batad We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more
Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa… Read more
Sa bulan sang Enero 2023, ang ILECO III may ara sang pinakanubo nga system loss nga 3.30% sa bilog nga Western Visayas. Ini mas manubo sa National Ceiling Standard sang Energy Regulatory Commission (ERC) nga indi magsobra sa 10.25% nga gina-pass-on sa mga miyembro konsumidores. Ang pagnubo sang aton system loss ang resulta sang padayon… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more