• SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 25, 26 KAG 28, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang ESTANCIA kag BATAD amo ang masunod: NOBYEMBRE 25, 2022 (BIYERNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) ESTANCIA:• Tanza• Jolog• LumbiaBATAD: •… Read more

  • CLEARING OPERATION IN BRGY. ILONGBUKID AND SAN FLORENTINO, SAN RAFAEL

    ILECO III Technical Team conducted scheduled clearing operation at Brgy. Ilongbukid and San Florentino, San Rafael, Iloilo today, November 21, 2022. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 21, 2022)

    Date: November 21, 2022 (Monday )Time of interruption: 2:29 PM Time of restoration: 4:20 PM Affected area: Poblacion, Anilao (portion) Activity: Replaced damaged distribution transformer We apologized for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ENERGY SAVING TIP

    Use LED lights. Read more

  • ANTI-OBSTRUCTION OF POWER LINES ACT(REPUBLIC ACT 11361)

    ‘An Act Ensuring the Continuous and Uninterrupted Transmission and Distribution of Electricity and Protection of the Integrity and Reliability of Power Lines, and Providing Penalties for Violations Thereof.’ Ginadumili-an ang mga masunod: 1. Pagtanom sang maskin ano nga sahi sang matag-as ukon naga-taas nga mga tanom ukon kahoy sa idalom sang distribution lines. 2. Pagpatindog… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more