
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa HUNYO 07, 2026 (DOMINGO), 6:00 AM- 6:00 PM (12 ka oras ang kalawigon). Ang oras kag apektado nga lugar sang sini nga power interruption amo… Read more
What: Load Shedding due to NGCP’s Manual Load Drop Date: June 2, 2026 (Tuesday) Time of power interruption: 5:00 p.m. Time of power restoration: 7:21 p.m. Areas Affected :Sara Feeder 3Municipality of SaraApologista (Portion), Bakabak, Crespo, Ferraris, Gildore (Portion), Lanciola, Padios, Poblacion Ilawod (Portion), Salcedo, Zerrudo Municipality of ConcepcionCalamigan (Portion) Cause of power interruption: Manual… Read more
What: Load Shedding due to NGCP’s Manual Load Drop Date: June 1, 2026 (Monday) Time of power interruption: 6:58 p.m. Estimated time of power restoration: Not yet determined Areas Affected : Feeder 2 of Daan Banwa Substation (Municipality of Estancia Botongon, Poblacion Zone 1, Poblacion Zone II, Poblacion Zone III) Cause of power interruption: Manual… Read more
NEWS AND UPDATES
ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ILECO3onFirePreventionMonthCelebration#SaPagIwasSaSunogHindiKaNagIisa Read more
https://www.facebook.com/watch/?v=884235392684016 Read more
1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more
BIDS AND NOTICES
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more