• ILECO III POWER ADVISORY (OCTOBER 15, 2022)

    *Update on NGCP’s scheduled power interruption Power has been restored in Natividad Area Coverage Time of power restoration:Natividad Area Coverage: 6:06 PM We apologize for the inconvenience. Thank you for your understanding. Read more

  • RECONNECTION OF PULL OUT KWHR METER AND REPLACED METER BASE LOOSE CONNECTION IN BATAD

    ILECO III Technical personnel conducted reconnection of pulled out kWhr Meter and replaced meter base loose connection at Brgy. Hall, Caw-I, Batad today, October 15, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more

  • ILECO III POWER ADVISORY (OCTOBER 15, 2022)

    *Update on NGCP’s unscheduled power interruption Power has been restored to all affected areas in our coverage. Time of power restoration as follows:Natividad Area Coverage: 3:13 a.m.Sara Area Coverage: 3:17 a.m.Panian Area Coverage: 3:17 a.m We apologize for the inconvenience. Thank you for your understanding. Read more

  • ON-SITE PMS IN NHA VILLAGE, DALIPE, LEMERY

    ILECO III conducted On-site Pre-Membership Seminar for prospected MCOs at NHA Village, Barangay Dalipe, Lemery yesterday February 27, 2023 (Monday) together with Barangay Electrician Association. It was attended by Ninety Two (92) MCOs and Barangay Officials of Brgy. Dalipe, Lemery. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • HAPPY BIRTHDAY VICE MAYOR IRAN!

    HAPPY BIRTHDAY HON. FILEMON M. IRAN, JR, VICE MAYOR OF BANATE, ILOILO. From ILECO III Family! Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more