• UNSCHEDULED POWER INTERRUPTION (APRIL 27, 2022)

    Date: April 27, 2022 (Wednesday) Time of interruption: 11:00 AM Time of restoration: 12:00 NNAffected area: Rizal St., Poblacion, San Dionisio, Iloilo Activity: Replaced damaged transformer and upgraded from 25 kVA to 37.5 kVA We apologize for the inconvenience. For your information. Read more

  • REPLACEMENT OF DEFECTIVE METERS IN ZONE 3, ALCANTARA, LEMERY

    ILECO III Technical Team conducted replacement of four (4) defective meters in Zone 3, Alcantara, Lemery on April 26, 2022 (Tuesday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 26, 2022)

    Date: April 26, 2022 (Tuesday) Time of interruption: 6:15 PM Time of restoration: 7:00 PM Affected area: Quiazan Florete, Batad, Iloilo Cause of interruption: Line fault due to vegetation We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Dispose cigarette butts properly. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • LOOK: ILECO III ATTENDED ABC MEETING IN CARLES, ILOILO

    ILECO III officers appeared to ABC Meeting in Carles headed by MSD Chief, Alex A. Demandante held at Liga Office on March 06, 2023. The said appearance intends to empower the Punong Barangays on the said municipality and at the same time encourage them to be participative in all coops activities. This is also one… Read more

  • FIRE SAFETY TIP

    ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • FIRE SAFETY TIP

    Keep flammable items away from children. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more