• CANCELLED ANG SCHEDULED POWER INTERRUPTION SA MARSO 18, 2023 SA BANWA SANG LEMERY

    Pahibalo sa mga katapo-konsumidores nga GIN-CANCEL ang SCHEDULED POWER INTERRUPTION sang ILECO III sa MARSO 18, 2023 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) bangud sa pagahiwaton nga Annual Fiesta sa Brgy. San Jose, Lemery, Iloilo. Ang apektado nga lugar sang sini nga CANCELLED power interruption sa banwa sang LEMERY amo ang… Read more

  • EMERGENCY POWER INTERRUPTION SA MARSO 19, 2023 SA BANWA SANG CONCEPCION

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa MARSO 19, 2023 (DOMINGO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-ubra sang Three Phase Line sa Brgy. Poblacion, Concepion, Iloilo. Ang apektado nga lugar sang sini nga power interruption sa banwa sang CONCEPCION amo ang masunod:• Bacjawan… Read more

  • UNSCHEDULED POWER INTERRUPTION (MARCH 15, 2023)

    Date: March 15, 2023 (Wednesday) Time of interruption: 4:50 PM Time of restoration: 5:45 PM Affected area: Purok 8, Tarong, Carles, Iloilo Activities: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Dispose cigarette butts properly. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • LOOK: ILECO III ATTENDED ABC MEETING IN CARLES, ILOILO

    ILECO III officers appeared to ABC Meeting in Carles headed by MSD Chief, Alex A. Demandante held at Liga Office on March 06, 2023. The said appearance intends to empower the Punong Barangays on the said municipality and at the same time encourage them to be participative in all coops activities. This is also one… Read more

  • FIRE SAFETY TIP

    ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • FIRE SAFETY TIP

    Keep flammable items away from children. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2302, S. 2023

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more