• RESCHEDULED POWER INTERRUPTION

    Pahibalo sa mga katapo-konsumidores nga ang PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 03, 2023 (SABADO) ang GIN-RESCHEDULE sa HUNYO 04, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: HUNYO 04, 2023 (DOMINGO)6:00 AM- 6:00 PM (12 ka… Read more

  • KANSELADO ANG ANNUAL PREVENTIVE MAINTENANCE SANG NGCP SA HUNYO 4, 2023

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang LOAD TRANSFER kag ANNUAL PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Panit-an 138/69kV 50MVA Transformer sa HUNYO 04, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang KANSELADO nga power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka oras ang kalawigon)KAG4:00… Read more

  • ILECO III POWER ADVISORY: UNSCHEDULED POWER INTERRUPTION

    AS OF 4:30 PM, MAY 31, 2023 CAUSE: HEAVY RAIN AFFECTED SUBSTATION: SARA SUBSTATION FOR YOUR INFORMATION AND REFERENCE. Read more

  • ILOILO III ELECTRIC COOPERATIVE, INC. commemorates the Liberation of Panay, a celebration of freedom from oppression

    The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more

  • FIRE SAFETY TIP

    Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • PRE-MEMBERSHIP SEMINAR FOR SEP RECIPIENTS OF BARANGAY NAGSULANG, LEMERY

    ILECO 3 Officers successfully conducted the Pre-Membership Seminar (PMS) for Sitio Electrification Program (SEP) recipients held at ILECO 3 Headquarter Site, Preciosa, Sara on March 15, 2023 (Wednesday). The above-mentioned seminar was attended by beneficiaries from barangay Nagsulang, Lemery and respectively in barangay Domingo, Sara. The requirements needed for application and subsidies granted to them… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more