• MAY SCHEDULED PREVENTIVE MAINTENANCE KAG LOAD TRANSFER ANG NGCP SA HULYO 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE kag LOAD TRANSFER ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa HULYO 15, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 6:00 PM (13 ka oras… Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION

    DATE: July 06, 2023 (Thursday) Time of interruption:Ajuy S/s: 9:00PMSara S/s: 9:00 PMPani-an S/s: 9:01 PMDaan Banwa S/s: 9:00 PM Estimated Time of power restoration: Sara S/s: 9:10 PMAjuy S/s: 9:08 PMPani-an S/s: 9:13 PMDaan Banwa S/s: 9:15 PM Affected areas: Whole coverage of ILECO III Cause of interruption: UNDER INVESTIGATION Our technical team is… Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION (UPDATE)

    DATE: July 05, 2023 (Wednesday) Time of interruption:Barotac Viejo S/s: 8:50 PMBanate S/s: 8:50 PM Estimated Time of power restoration: Barotac Viejo S/s : 9:05 PMBanate S/s: 9:06 PM Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: UNDER INVESTIGATION Our technical team is closely coordinating with NGCP regarding the cause of… Read more

  • ILOILO III ELECTRIC COOPERATIVE, INC. commemorates the Liberation of Panay, a celebration of freedom from oppression

    The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more

  • FIRE SAFETY TIP

    Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • PRE-MEMBERSHIP SEMINAR FOR SEP RECIPIENTS OF BARANGAY NAGSULANG, LEMERY

    ILECO 3 Officers successfully conducted the Pre-Membership Seminar (PMS) for Sitio Electrification Program (SEP) recipients held at ILECO 3 Headquarter Site, Preciosa, Sara on March 15, 2023 (Wednesday). The above-mentioned seminar was attended by beneficiaries from barangay Nagsulang, Lemery and respectively in barangay Domingo, Sara. The requirements needed for application and subsidies granted to them… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more