• POWER RESTORATION IN BRGY. CUBAY, SAN DIONISIO

    ILECO III conducted power restoration of Three (3) units of 25kVA Transformer of NSDMPC at Brgy. Cubay, San Dionisio, Iloilo today, January 12, 2023. For your information. Read more

  • SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA ENERO 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga LOAD TRANSFER kag SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA TR1 sa Concepcion Substation sa ENERO 15, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod:4:00 AM- 5:00 AM (1 ka oras ang… Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 10, 2023)

    Date: January 10, 2023 Time.of interruption: 8:09 PM Time of restoration: 8:43 PM Affected area: St. Therese Village, Dayhagan, Carles, Iloilo Activity: Repaired secondary neutral bushing loose connection of transformer We apologize for the inconvenience. For your information. Read more

  • ILOILO III ELECTRIC COOPERATIVE, INC. commemorates the Liberation of Panay, a celebration of freedom from oppression

    The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more

  • FIRE SAFETY TIP

    Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • PRE-MEMBERSHIP SEMINAR FOR SEP RECIPIENTS OF BARANGAY NAGSULANG, LEMERY

    ILECO 3 Officers successfully conducted the Pre-Membership Seminar (PMS) for Sitio Electrification Program (SEP) recipients held at ILECO 3 Headquarter Site, Preciosa, Sara on March 15, 2023 (Wednesday). The above-mentioned seminar was attended by beneficiaries from barangay Nagsulang, Lemery and respectively in barangay Domingo, Sara. The requirements needed for application and subsidies granted to them… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more