
POWER RATES
POWER ADVISORIES
Date: October 13, 2022 Time of interruption: 10:11 AM Time of Restoration: 10:45 AM Affected Area: Sitio Nangka, Anoring, Sara Reason/Activity: Replacement of rotten pole We apologize for the inconvenience. For your information. Read more
ILECO III Technical personnel conducted clearing of lines due to vegetation at Sitio Bangon2x, Rizal, Barotac Viejo today, October 11, 2022 (Tuesday). No power interruption occurred. Keep safe Warriors of Light For your information. Read more
Date: October 11, 2022 Time of interruption: 3:19 PM Time of Restoration: 5:31 PM Affected Area: Poscolon, San Rafael Reason/Activity: Transient line fault. Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
System loss is one of the burdens of Electric Cooperatives all over the country, if not controlled and monitored, it is sometimes the reason why higher rates/charges are being added to power bills of Member-Consumer-Owners (MCOs) . Relative to this, The Iloilo III Electric Cooperative Inc. (ILECO III) in coordination with Sara Area Office led… Read more
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more
The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more
Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more