
POWER RATES
POWER ADVISORIES
ILECO III Technical Team on-going repair of cut-off Three (3) Phase line damage by fire at Devera, Sara, Iloilo today, November 17, 2022. For your information. Read more
Date: November 17, 2022 Time of interruption: 5:20 PM Time of Restoration: 6:10 PM Cause of interruption: Transient line fault Affected areas: Sitio Cawit, Cabagohan, Batad We apologize for the inconvenience. For your information. Read more
Date: November 17, 2022 Time of interruption: 4:40 PM Time of Restoration: 5:35 PM Cause of interruption: Transient line fault Affected areas: Brgy. Quiasan Lopez and Nangka, Batad We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more
Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more
Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more
ILECO 3 Officers successfully conducted the Pre-Membership Seminar (PMS) for Sitio Electrification Program (SEP) recipients held at ILECO 3 Headquarter Site, Preciosa, Sara on March 15, 2023 (Wednesday). The above-mentioned seminar was attended by beneficiaries from barangay Nagsulang, Lemery and respectively in barangay Domingo, Sara. The requirements needed for application and subsidies granted to them… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more