https://web.facebook.com/NGCPph/posts/pfbid03884fTS6UFPzAQyrVSGUtukDQDXxQTRqwDQqLW6YHTLdQQeuj311E8uus4Zvjjcril Read more
Ang aton mga substations nga na energize ang nag-off line sa liwat subong alas 9:08 a.m. bangud sang pag-tripping sang planta sang PEDC nga nagdulot sang unstable nga supply sang kuryente sa bug-os nga Panay power grid. Sa subong nga ti-on ang mga energized nga mga feeders amo ang mga masunod: Sara Substation- Feeder 4… Read more
ari ang eksplinasyon nahangungod sa pagpatigayon sang MLD sang aton nga Coverage Area. INDI ini kontrolado sang ILECO III bangud kulang ang supply sang kuryente nga ginahatag sang generation apang ang demand nga ginakinahanglan sang aton miyembro-konsumidor ang masobra sa available nga capasidad sang planta. Madamo gid nga salamat sa inyo nga paghangop. Read more
NEWS AND UPDATES
The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more
Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more
Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more
ILECO 3 Officers successfully conducted the Pre-Membership Seminar (PMS) for Sitio Electrification Program (SEP) recipients held at ILECO 3 Headquarter Site, Preciosa, Sara on March 15, 2023 (Wednesday). The above-mentioned seminar was attended by beneficiaries from barangay Nagsulang, Lemery and respectively in barangay Domingo, Sara. The requirements needed for application and subsidies granted to them… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more