• UNSCHEDULED POWER INTERRUPTION (JUNE 12, 2022)

    Date: June 12, 2022 Time of interruption: 5:10 PM Time of restoration: 5:50 PM Affected area: San Dionisio, San Rafael, Iloilo Activity: Replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 12, 2022)

    Date: June 12, 2022 Time of interruption: 4:31 PM Time of restoration: 5:15 PM Affected area: Sitio Hacienda Rica, Badiang, Anilao, Iloilo Activity: Refusing primary cut-out We apologize for the inconvenience. For your information. Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNIT Buy an aircon with high Energy Efficiency. Ratio indicated in the yellow label. Change or clean your AC’s air filters regularly. Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs. Repair leaky ducts to reduce heating and cooling costs. Decorate for a cooler… Read more

  • MAGPAREHISTRO NA SA ATON 31ST AGMA

    ILOILO III ELECTRIC COOPERATIVE, INC. 31st VIRTUAL ANNUAL GENERAL MEMBERSHIP ASSEMBLY Link for Registration: https://forms.gle/1xEEg6uTxFaCxmhk9 https://forms.gle/aexZrv4zhbcBSn4X8 https://forms.gle/Wa8JXiYagacCoBcm6 Read more

  • ILECO 3 HOLY WEEK SCHEDULE

    PAHIBALO SA MGA KATAPU-KONSUMIDORES ILECO 3 Holy Week Schedule Read more

  • HAPPY BIRTHDAY DIRECTOR BELITA!

    Happy happy birthday to our dear Board of Director, Engr. Vincent H. Belita. Wishing you all the best in life and may God bless you always. From your ILECO III Family! Read more

  • LOOK: ILECO III CONDUCTED ANNUAL RECOLLECTION ACTIVITY FOR EMPLOYEES

    As part of the cooperative’s continued program to heighten employees’ spiritual growth, ILECO III conducted a Recollection Activity focusing on the topic “Season of Love and Holiness, How to Fight Evil during Lent” on April 01, 2023 (Saturday) at Dos Pharma Residence in San Dionisio, Iloilo. The resource speaker for this recollection was Rev. Father… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more