• ILECO III POWER ADVISORY (OCTOBER 15, 2022)

    *Update on NGCP’s scheduled power interruption Power has been restored in Natividad Area Coverage Time of power restoration:Natividad Area Coverage: 6:06 PM We apologize for the inconvenience. Thank you for your understanding. Read more

  • RECONNECTION OF PULL OUT KWHR METER AND REPLACED METER BASE LOOSE CONNECTION IN BATAD

    ILECO III Technical personnel conducted reconnection of pulled out kWhr Meter and replaced meter base loose connection at Brgy. Hall, Caw-I, Batad today, October 15, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more

  • ILECO III POWER ADVISORY (OCTOBER 15, 2022)

    *Update on NGCP’s unscheduled power interruption Power has been restored to all affected areas in our coverage. Time of power restoration as follows:Natividad Area Coverage: 3:13 a.m.Sara Area Coverage: 3:17 a.m.Panian Area Coverage: 3:17 a.m We apologize for the inconvenience. Thank you for your understanding. Read more

  • MAGPAREHISTRO NA SA ATON 31ST AGMA

    ILOILO III ELECTRIC COOPERATIVE, INC. 31st VIRTUAL ANNUAL GENERAL MEMBERSHIP ASSEMBLY Link for Registration: https://forms.gle/1xEEg6uTxFaCxmhk9 https://forms.gle/aexZrv4zhbcBSn4X8 https://forms.gle/Wa8JXiYagacCoBcm6 Read more

  • ILECO 3 HOLY WEEK SCHEDULE

    PAHIBALO SA MGA KATAPU-KONSUMIDORES ILECO 3 Holy Week Schedule Read more

  • HAPPY BIRTHDAY DIRECTOR BELITA!

    Happy happy birthday to our dear Board of Director, Engr. Vincent H. Belita. Wishing you all the best in life and may God bless you always. From your ILECO III Family! Read more

  • LOOK: ILECO III CONDUCTED ANNUAL RECOLLECTION ACTIVITY FOR EMPLOYEES

    As part of the cooperative’s continued program to heighten employees’ spiritual growth, ILECO III conducted a Recollection Activity focusing on the topic “Season of Love and Holiness, How to Fight Evil during Lent” on April 01, 2023 (Saturday) at Dos Pharma Residence in San Dionisio, Iloilo. The resource speaker for this recollection was Rev. Father… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more