• TEMPORARY RE-ERECTION OF TOPPLED POLE IN STO. TOMAS, BAROTAC VIEJO CAUSED BY TYPHOON PAENG

    ILECO III Technical personnel conducted a temporary re-erection of toppled pole caused by “Typhoon Paeng (Nalgae)” today at Brgy. Sto. Tomas, Barotac Viejo, October 29, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 29, 2022)

    Date: October 29, 2022 Time of interruption: 2:00 AM Time of Restoration: 2:30 PM (Estimated) Affected Area: Portion of Sto. Rosario, Ajuy Reason/Activity: Line fault due to vegetation (uprooted tree) damaging ILECO III distribution line/ Inspection and on-going clearing of lines due to vegetation. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 29, 2022)

    Date: October 29, 2022 Time of interruption: 9:41 AM Time of Restoration: 10:45 AM Affected Area: Ajuy Substation (Feeder 2) AJUY• Adcadarao• Agbobolo• Badiangan• Barrido• Bato Biasong• Bay-ang• Central• Culasi• Lanjagan PORTION• Luca• Malayu-an• Mangorocoro• Nasidman• Pantalan nabaye• Pedada• Pili• Pinantan Diel• Pinantan Elizalde• Pinay Espinosa• Poblacion• Progreso• Punta Buri• San Antonio• Santo Rosario• Tagubanhan•… Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • FREQUENTLY ASKED QUESTIONS

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • SAFETY TIPS SA PANAHON SANG TAG-ULAN

    1. Patyon ang Main Switch kung nagabaha na sa inyo lugar. 2. Indi pagtandugon ang mga basa nga wirings sang kuryente. 3. Indi magsaka sa mga kahoy bangud possible nga maglatay ang boltahe sang kuryente sa mga basa nga sanga. 4. Pagkatapos mabahaan ang inyo lugar, indi anay pagbuksan ang main switch. Magtawag sang accredited… Read more

  • ENERGY SAVING TIP

    Turn off the lights when not needed. Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more