• UNSCHEDULED POWER INTERRUPTION (FEBRUARY 28, 2023)

    Date: February 28, 2023 Time of interruption: 7:35 PM Time of restoration: 7:56 PM Affected areas: Bulak Norete and Alapasco, Batad, Iloilo Activities: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (FEBRUARY 27, 2023)

    Date: February 27, 2023 Time of interruption: 8:27 AM Time of restoration: 9:25 AM Affected area: Mamhut Norte, Balasan, Iloilo (portion) Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (FEBRUARY 27, 2023)

    Date: February 27, 2023 Time of interruption: 8:24 AM Time of restoration: 8:55 AM Affected area: Sitio Nabitasan, Poblacion, Balasan, Iloilo Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • FREQUENTLY ASKED QUESTIONS

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more