• PULL OUT OF DAMAGED PRIVATE TRANSFORMER IN BATAD

    ILECO III Technical personnel conducted pull out of One (1) unit damage private transformer at Municipal of Batad today, October 20, 2022 (Thursday). Keep safe Warriors of Light For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 19, 2022)

    Date: October 19, 2022 Time of interruption: 6:25 PM Time of Restoration: 7:05 PM Affected Area: Bulak Sur and Alapasco, Batad Reason/Activity: Transient line fault/ Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 19, 2022)

    Date: October 19, 2022 Time of interruption: 1:40 PM Time of Restoration: 3:40 PM Affected Area: Alapasco, Batad Reason/Activity: Repair of burned open secondary jumper and replaced burned jumper of secondary bushing of transformer We apologize for the inconvenience. For your information. Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more

  • NATIONAL ELECTRICAL SAFETY MONTH

    ILOILO III ELECTRIC COOPERATIVE, INC. joins in celebrating National Electrical Safety Month 2023. Read more

  • Ngaa may power interruption?

    Read more

  • ILECO III FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more