• UNSCHEDULED NGCP POWER INTERRUPTION (FEBRUARY 20, 2023)

    Time of interruption: 6:28 p.m.Estimated time of restoration: Not yet determined Affected Areas: Municipalities of ANILAO, BANATE, BAROTAC VIEJO and SAN RAFAEL Cause of interruption: Load shedding of the transmission provider, National Grid Corporation of the Philippines (NGCP) Our Technical Team is closely coordinating with NGCP for the updates and estimated time of power restoration.… Read more

  • UNSCHEDULED NGCP POWER INTERRUPTION (FEBRUARY 20, 2023)

    Time of interruption: 1:28 p.m.Estimated time of restoration: Not yet determined Affected Areas (ILECO III): Municipalities of ANILAO, BANATE, BAROTAC VIEJO, SAN RAFAEL, SARA, SAN DIONISIO, CONCEPCION, AJUY, LEMERY, BATAD, ESTANCIA, BALASAN, and CARLES Cause of interruption: High system voltage of Panay Grid transmission line operated by the National Grid Corporation of the Philippines (NGCP)… Read more

  • UNSCHEDULED POWER INTERRUPTION UPDATEAs of 12:45 PM, February 20, 2023 (Monday)

    For your information. Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more

  • NATIONAL ELECTRICAL SAFETY MONTH

    ILOILO III ELECTRIC COOPERATIVE, INC. joins in celebrating National Electrical Safety Month 2023. Read more

  • Ngaa may power interruption?

    Read more

  • ILECO III FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more