• UNSCHEDULED POWER INTERRUPTION (DECEMBER 26, 2023)

    Date: December 26, 2023(Tuesday) Time of interrption : 6:10 PM Time of restoration : 7:05 PM Affected area: Concepcion Activity: Inspection/clearing of line due to animal contact (gecko) and replace pin insulator. We apologize for the inconvenience. For your information. Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION

    DATE: December 20, 2023 (Wednesday) Time of interruption: 1:28 AMTime of power restoration: 2:13 AM Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: Tripping of 69 kV BUS 2 on Dingle Substation We apologize for the inconvenience. For your information. Read more

  • ANG SCHEDULED POWER INTERRUPTION SA DISYEMBRE 13, 2023 GIN-RESCHEDULE SA DISYEMBRE 16, 2023

    Pahibalo sa mga katapo-konsumidores nga ang SCHEDULED POWER INTERRUPTION sang ILECO III sa DISYEMBRE 13, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) ang GIN-RESCHEDULE sa DISYEMBRE 16, 2023 (SABADO) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga… Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more

  • NATIONAL ELECTRICAL SAFETY MONTH

    ILOILO III ELECTRIC COOPERATIVE, INC. joins in celebrating National Electrical Safety Month 2023. Read more

  • Ngaa may power interruption?

    Read more

  • ILECO III FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more