• SCHEDULED POWER INTERRUPTION SA HUNYO 20-24, 27-30 KAG HULYO 1, 2022 SA BANWA SANG LEMERY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III magaumpisa ini alas 9:00 AM- 4:00 PM (7 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang petsa kag lugar nga apektado sang sini nga power interruption amo ang masunod: PETSA APEKTADO NGA BARANGAY Hunyo 20, 2022 CapiƱahan, LemeryHunyo 21, 2022 Cabantohan,… Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 15, 2022)

    Date: June 15, 2022 Time of interruption: 11:30 AM Time of restoration: 12:40 PM Affected areas: Batuan and Amayong, San Dionisio, Iloilo Activity: Replacement of busted transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 15, 2022)

    Date: June 15, 2022 Time of interruption: 9:00 AM Time of restoration: 9:50 AM Affected area: Pili, Ajuy, Iloilo Activity: Replacement of busted transformer We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. Read more

  • ENERGY SAVING TIP

    Read more

  • FIRE SAFETY TIP

    Keep a fire extinguisher within reach. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more