• SCHEDULED POWER INTERRUPTION SA OKTUBRE 7 KAG 8, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BATAD amo ang masunod: OKTUBRE 07, 2022 (BIYERNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Alapasco• Bolhog• Bulak Norte• Bulak Sur•… Read more

  • SCHEDULED POWER INTERRUPTION SA OKTUBRE 1, 2022 SA BANWA SANG BANATE

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa Oktubre 01, 2022 (Sabado), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon para sa pag-ubra sang Double Circuit line halin sa Poblacion, Banate pakadto sa Carmelo, Banate para sa ginpatigayon nga on-going Banate Substation. Ang apektado nga lugar sang sini nga… Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 27, 2022)

    Date: September 27, 2022 Time of interruption: 10:20 AM Time of restoration: 10:50 AM Affected area: Poblacion, Ajuy, Iloilo Activity: Retirement of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FREQUENTLY ASKED QUESTION

    DIIN NAGAHALIN ANG ATON KURYENTE? Read more

  • HAPPY BIRTHDAY VICE PRESIDENT DUTERTE!

    HAPPY BIRTHDAY HON. SARA DUTERTE-CARPIO, VICE PRESIDENT OF THE REPUBLIC OF THE PHILIPPINES! From ILECO III Family! Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • FREQUENTLY ASKED QUESTION

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more