• MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA ENERO 7, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa ENERO 07, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 4:00 AM- 5:00 AM (1 ka oras ang kalawigon)KAG5:00 PM-… Read more

  • UNSHEDULED POWER INTERRUPTION (DECEMBER 27, 2022)

    Date: December 27, 2022 (Monday) Time of interruption: 10:42 AM Time of restoration: 11:52 AM Affected area: Sitio Piliwan, Luca, Ajuy, Iloilo Activity: installation of 25 KVA distribution transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (DECEMBER 27, 2022)

    Date: December 27, 2022 Time of interruption : 6:05 AM Time restored : 6:50 AM Affected area : Sitio Nabitasan, Poblacion, Balasan, Iloilo Activity : Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang HUNYO 12, 2023 (LUNES) ang gin-deklara nga REGULAR HOLIDAY sa bug-os nga pungsod para sa pag-obserba sang INDEPENDENCE DAY. Bangud sini, SARADO ang ILECO III Main Office SARA AREA OFFICE kag NATIVIDAD AREA OFFICE sa nasambit nga adlaw. Apang BUKAS ang PANI-AN AREA OFFICE para sa pagbaton sang bayad… Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • LOOK: ILECO III Personnel conducted BAPA Officers Meeting nad Information Education Campaign (IEC) attended by 34 BAPA Members in Latawan, Sara Iloilo on June 5, 2023 (Monday)

    This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more