• SCHEDULED POWER INTERRUPTION SA MAYO 21, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa MAYO 21, 2022 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing sang linya. Ang lugar nga apektado sang sini nga power interruption sa Sara amo ang masunod: AguirreAntonio Yusay/PasigAposagaArdemilBatoDel CastilloDomingoJuanezaLatawanMalapayaMuycoTady Madamo gid nga salamat sa… Read more

  • REPLACEMENT OF DEFECTIVE METERS IN BRGY. TARONG, CARLES

    ILECO III Technical Team conducted replacement of defective meters in Brgy. Tarong, Carles, Iloilo and Purok 4, Mamhut Sur, Balasan, Iloilo today, May 16, 2022 (Monday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 16, 2022)

    Date: May 16, 2022 (Monday) Time of interruption: 9:00 AM Time of restoration: 9:48 AM Affected area: Purok 1 & 2, Cabalic, Balasan, Iloilo Activity: Repaired secondary connection of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more