
POWER RATES
POWER ADVISORIES
Date: December 3, 2022 (Saturday) Time of interruption: 2:00 PM Estimated Time of Restoration: 3:00 PM Cause of interruption: Troubleshooting of Banate Substation 15KV Mainbreaker due to malfunction of swithches. Affected areas: Municipalities of Anilao and Banate We apologize for the inconvenience. For your information. Read more
Date: December 03, 2022 (Saturday) Time of interruption: 10: 17 AM Time of restoration: 11: 18 AM Affected area: Whole Municipality of Anilao and Banate Cause of interruption: Main Breaker Trip Off We apologize for the inconvenience. For your information. Read more
ILECO III Technical Team installed private distribution transformer in Brgy. Malapaya, Sara, Iloilo today, December 02, 2022 (Tuesday). For your information. Read more
NEWS AND UPDATES
1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more
Dry your clothes and dishes naturally. Read more
HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more
Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more